<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>انجمن ژئومکانیک نفت ایران</PublisherName>
				<JournalTitle>نشریه ژئومکانیک و ژئوانرژی</JournalTitle>
				<Issn>2538-4651</Issn>
				<Volume>3</Volume>
				<Issue>شماره 1 (بهار1398، انگلیسی)</Issue>
				<PubDate PubStatus="epublish">
					<Year>2019</Year>
					<Month>05</Month>
					<Day>22</Day>
				</PubDate>
			</Journal>
<ArticleTitle>4D geomechanical simulations for field development planning</ArticleTitle>
<VernacularTitle>4D geomechanical simulations for field development planning</VernacularTitle>
			<FirstPage>34</FirstPage>
			<LastPage>44</LastPage>
			<ELocationID EIdType="pii">88409</ELocationID>
			
<ELocationID EIdType="doi">10.22107/jpg.2019.88409</ELocationID>
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>Jorg</FirstName>
					<LastName>Herwanger</LastName>
<Affiliation>MP-Geomechanics</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2019</Year>
					<Month>01</Month>
					<Day>08</Day>
				</PubDate>
			</History>
		<Abstract>3D and 4D geomechanical can be time-consuming to build and calibrate. However, once such a model is built, it is relative straightforward to use this model for various field development and management applications. In so doing, the return on the initial investment of time and effort in the creation of a 4D geomechanical model can be substantial. I present a case study where a 4D geomechanical model of a deepwater turbidite field under water flood is used to: &lt;br /&gt;&lt;br /&gt;Assessment of wellbore stability for drilling inclined infill wells after a stuck pipe event  &lt;br /&gt;Calculation of maximum allowable injection pressures during hydraulic stimulation to avoid out-of-zone growth of stimulated fractures, and &lt;br /&gt;evaluation of risk of fault re-activation during a range of production scenarios for pressure support in order to establish safe operational limits for pressure support. &lt;br /&gt;&lt;br /&gt;Model building uses seismic inversion volumes to constrain a geological facies model, followed by upscaling to a reservoir simulation model and history matching. Similarly, a 3D geomechanical property model is built to the seafloor. The calibration of the pre-production stress state of the geomechanical model comprises of matching the results of 3D finite element stress field calculations to 1D wellbore models. The calibration uses a novel method of linking tectonic strain terms in poro-elastic equations in the 1D and 3D models. Production and injection processes are the computed using a fully coupled finite element based geomechanical flow simulator, solving multi-phase (black-oil) fluid flow and geomechanics equations simultaneously on the same computational mesh. The computational mesh is optimized for geomechanical predictions of wellbore and fault stability.</Abstract>
			<OtherAbstract Language="FA">3D and 4D geomechanical can be time-consuming to build and calibrate. However, once such a model is built, it is relative straightforward to use this model for various field development and management applications. In so doing, the return on the initial investment of time and effort in the creation of a 4D geomechanical model can be substantial. I present a case study where a 4D geomechanical model of a deepwater turbidite field under water flood is used to:&lt;br /&gt;&lt;br /&gt;Assessment of wellbore stability for drilling inclined infill wells after a stuck pipe event &lt;br /&gt;Calculation of maximum allowable injection pressures during hydraulic stimulation to avoid out-of-zone growth of stimulated fractures, and&lt;br /&gt;evaluation of risk of fault re-activation during a range of production scenarios for pressure support in order to establish safe operational limits for pressure support.&lt;br /&gt;&lt;br /&gt;Model building uses seismic inversion volumes to constrain a geological facies model, followed by upscaling to a reservoir simulation model and history matching. Similarly, a 3D geomechanical property model is built to the seafloor. The calibration of the pre-production stress state of the geomechanical model comprises of matching the results of 3D finite element stress field calculations to 1D wellbore models. The calibration uses a novel method of linking tectonic strain terms in poro-elastic equations in the 1D and 3D models. Production and injection processes are the computed using a fully coupled finite element based geomechanical flow simulator, solving multi-phase (black-oil) fluid flow and geomechanics equations simultaneously on the same computational mesh. The computational mesh is optimized for geomechanical predictions of wellbore and fault stability.</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">case study</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Numerical Model</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Calibration</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">wellbore stability</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">inclined well</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Fault stability</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">hydraulic stimulation</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">fracture containment</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">http://www.irpga-journal.ir/article_88409_b82862570d3c6caab002e4efba01c58e.pdf</ArchiveCopySource>
</Article>
</ArticleSet>
