[1] Warren, J. (1940). Causes, Preventions, and Recovery of stuck drill pipe. API-40-030, Drilling and Production Practice. American Petroleum Institute.
[2] Hempkins, W. B., Kingsborough, R.H., Lohec, W.E., Nini, C.J. (1987). Multivariate Statistical Analysis of Stuck Drillpipe Situations. SPE Drilling Engineering, 2(03), 237-244. https://doi.org/10.2118/14181-PA
[3] Bradley, W. B., Jarman, D., Plott, R. S., Wood, R. D., Schofield, T. R., Auflick, R. A., & Cocking, D. (1991). A Task Force Approach to Reducing Stuck Pipe Costs. SPE/IADC Drilling Conference, Amsterdam, Netherlands. SPE-21999-MS. https://doi.org/10.2523/21999-MS
[4] Siruvuri, C., Nagarakanti, S., & Samuel, R. (2006). Stuck Pipe Prediction and Avoidance: A Convolutional Neural Network Approach. IADC/SPE Drilling Conference, Miami, Florida, USA.SPE-98378-MS. https://doi.org/10.2118/98378-MS
[5] Poordad, S., Chamkalani, A., & Pordel Shahri, M. (2013). Support vector machine model: a new methodology for stuck pipe prediction. SPE Middle East Unconventional Resources Conference and Exhibition, Muscat, Oman. SPE-164003-MS. https://doi.org/10.2118/164003-MS
[6] Elmousalami, H. H., & Elaskary, M. (2020). Drilling stuck pipe classification and mitigation in the Gulf of Suez oil fields using artificial intelligence. Journal of Petroleum Exploration and Production Technology, 10(5), 2055-2068. https://doi.org/10.1007/s13202-020-00857-w
[7] Kizayev, T., Irawan, S., Khan, J. A., Khan, S. A., Cai, B., Zeb, N., & Wayo, D. D. K. (2023). Factors affecting drilling incidents: Prediction of suck pipe by XGBoost model. Energy Reports, 9, 270-279. https://doi.org/10.1016/j.egyr.2023.03.083
[8] Salminen, K., Cheatham, C., Smith, M., & Valiullin, K. (2016). Stuck Pipe Prediction by Use of Automated Real-Time Modeling and Data Analysis. SPE/IADC Drilling Conference and Exhibition, London, UK. SPE-178888-MS. https://doi.org/10.2118/178888-MS
[9] Alshaikh, A. A., Albassam, M. K., Al Gharbi, S. H., & Al-Yami, A. S. (2018). Detection of Stuck Pipe Early Signs and the Way Toward Automation. Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, UAE. SPE-193026-MS. https://doi.org/10.2118/193026-MS
[10] Jahanbakhshi, R., Keshavarzi, R., Aliyari-Shoorehdeli, M., & Emamzadeh, A. (2013). Intelligent Prediction of Differential Pipe Sticking by Support Vector Machine Compared With Conventional Artificial Neural Networks: An Example of Iranian Offshore Oil Fields. SPE Drilling & Completion, 27(04), 586-595. https://doi.org/10.2118/163062-PA
[11] Jardine, S. I., McCann, D. P., & Barber, S. S. (1992). An Advanced System for the Early Detection of Sticking Pipe. SPE/IADC Drilling Conference, New Orleans, Louisiana, USA. SPE-23915-MS. https://doi.org/10.2523/23915-MS
[12] Mitchell, J. (2001). Trouble-Free Drilling: Stuck Pipe Prevention (Vol. 1). Drilbert Engineering, Incorporated. ISBN: 978-0-9722986-0-6
[13] Shadizadeh, S. R., Karimi, F., & Zoveidavianpoor, M. (2010). Drilling Stuck Pipe Prediction in Iranian Oil Fields: An Artificial Neural Network Approach. Iranian Journal of Chemical Engineering (IJChE), 7(4), 29-41. URL:https://www.ijche.com/article_10326_d828d938534fe550f6f1c4c0c953bb5e.pdf
[14] Yarim, G., Uchytil, R. J., May, R. B., Trejo, A., & Church, P. (2007). Stuck Pipe Prevention—A Proactive Solution to an Old Problem. SPE Annual Technical Conference and Exhibition, Anaheim, California, USA. SPE-109914-MS. https://doi.org/10.2118/109914-MS